Home/Blog/What Is a Tech Pack? What to Include Before You Brief a Clothing Manufacturer
Textile & Apparel Sourcing
September 21, 2026
16 min read

What Is a Tech Pack? What to Include Before You Brief a Clothing Manufacturer

What a tech pack is, the nine sections a clothing manufacturer needs to quote and sample accurately, how it differs from a spec sheet and a pattern, who makes it, and what to send a factory if you do not have one yet.

Alex Morgan β€” SourceBridge Sourcing Specialist

Alex Morgan

Senior Sourcing Specialist Β· SourceBridge

What a Tech Pack Is

A tech pack, short for technical package, is the document a clothing brand hands to a manufacturer to explain exactly what to make. It replaces the conversation you would otherwise have to hold across dozens of messages: what the garment looks like from every angle, what it is made of, how it is constructed, what every size measures, where the labels go, and how the finished piece is packed. A factory reads it to quote, to cut a sample, and later to check its own production against what was agreed.

It is worth being precise about what a tech pack is not. It is not a mood board, a sketch with a few notes, or a link to a similar product on a competitor's website. Those are useful references, and a good sourcing partner can work from them, but they leave the factory guessing. Every guess becomes a sample round, and every sample round in an overseas program costs at least a week of production time plus 5 to 7 days of courier transit each way. A complete tech pack is the cheapest way to shorten the path from brief to approved sample.

This guide explains what goes into a tech pack for clothing, how detailed it needs to be at each stage, how it differs from a spec sheet and a pattern, who makes it, and what to do if you do not have one yet. It is written for private label and DTC brands ordering a first or early production run of 300 to 5,000 units, whether from a factory you found yourself or through a sourcing partner such as SourceBridge, which works with clothing and home-textile manufacturers in Turkey.

Why a Tech Pack Matters More When You Source Overseas

A domestic sample room can walk over to your desk and ask what you meant. A factory in Istanbul, Dhaka or Guangzhou cannot. It works from the document, and where the document is silent it applies its own default: its usual stitch, its usual label position, its usual poly bag. Those defaults are rarely wrong in an absolute sense, but they are frequently not what you had in mind, and by the time you see the difference a sample has already been made and shipped.

Three consequences follow for buyers sourcing from Turkey or anywhere else outside their own country.

  • Quotes depend on it. A factory cannot price a garment it cannot fully picture. Fabric weight, construction complexity, the number of components and the decoration method all move the unit price. A brief without them gets either a guess with a wide margin built in or a request for more information before any number is given.
  • Samples depend on it. The first sample, usually called a proto, is the factory's interpretation of the tech pack. If the tech pack is complete, the proto is close and the second round is a fit correction. If it is thin, the proto is a starting point and you are two rounds further from production than you needed to be.
  • Disputes depend on it. When a production run arrives and something is not as expected, the tech pack and the approved pre-production sample are the reference both sides go back to. If a detail was never written down, it is very hard to argue that the factory got it wrong.
  • The Nine Sections of a Clothing Tech Pack

    There is no single mandated format, and factories will accept a tech pack as a PDF, a spreadsheet, a slide deck or an export from tech pack software, as long as the content is complete and unambiguous. The sections below are what a manufacturer looks for. Cover them all, even briefly, and the factory can quote and sample without a follow-up call.

    1. Cover Page and Style Summary

    Style name and number, season or collection, the date and version number of the document, your brand contact, and a one-line description of the garment. Version control matters more than it looks: once samples start moving, both you and the factory need to know which revision of the tech pack a sample was cut from. A style number that appears on every page, every sample tag and every email subject line saves a surprising amount of confusion later.

    2. Flat Sketches

    Technical drawings of the garment from the front and the back, plus side or detail views wherever the construction is not obvious from the front. Flats are drawn without a body and without shading, so that seams, topstitching, pockets, closures and trims are visible and countable. A photograph of a similar garment is a helpful reference but does not replace a flat, because a photograph hides the back, the inside and the details you want changed.

    Number each callout on the sketch and describe it in a legend: "1: 1 cm single-needle topstitch along neckline", "2: kangaroo pocket, bagged, 2 cm topstitch at opening". This is the part of the tech pack the sample room reads most closely.

    3. Bill of Materials

    A list of everything the garment is made of, with a specification for each line. For the main fabric that means fiber composition, construction (single jersey, French terry, 2x2 rib, twill and so on), weight in grams per square meter, finish, and colour with a Pantone or lab-dip reference. For trims it means thread, labels, zips, buttons, drawcords, eyelets, elastic and interlining, each with a size, material, colour and, where you have one, a supplier or reference code.

    The bill of materials is where two things you care about are actually enforced. Certifications such as OEKO-TEX Standard 100 or GOTS attach to specific materials, so if your brand promise depends on them, write the requirement against the fabric line rather than mentioning it once in the brief. And Amazon or retailer packaging rules, such as a poly bag with a suffocation warning, are a bill-of-materials line as well.

    4. Construction and Stitching Details

    How the garment is put together: seam types, stitch types, stitches per inch or centimeter, seam allowances, where seams are overlocked, coverstitched or bound, hem depths, and any reinforcement such as bar tacks at pocket corners. If a detail is standard for the garment type you can say so, but say it. "Standard construction" without a reference invites the factory's default.

    5. Measurement Specification and Grading

    A table of points of measure for the base size, with a tolerance for each, and the grade rule that produces the other sizes. Typical points for a T-shirt are chest width, body length from high point shoulder, shoulder width, sleeve length, armhole depth, neck width, neck drop and hem width. For trousers they include waist, hip, thigh, front and back rise, inseam and leg opening.

    State clearly which sizing system you are using. A US medium, a UK medium and a Turkish medium are not the same garment, and a factory that assumes its home market's convention will grade correctly to the wrong base. If you are selling on Amazon, your size chart in the listing and your measurement spec in the tech pack should come from the same table.

    6. Colourways

    Every colour combination the style will be produced in, with the body colour and each trim colour specified per colourway, ideally as a small table of component versus colourway. Minimum order quantities in Turkey are set per style and per colour, commonly 300 to 500 units per style-colour for basics, so the colourway page is also where your order structure becomes visible to the factory.

    7. Labels, Branding and Decoration

    Main label, size label, care and content label, hang tag and any woven or printed branding: the artwork for each, the material, the dimensions, and a placement diagram with the exact position and attachment method. Care and fiber-content labels are a legal requirement in the US and the wording must match the bill of materials.

    For decoration, specify the method (screen print, DTG, embroidery, heat transfer, sublimation), the artwork file, the print size, the placement measured from a fixed point on the garment, the number of colours, and the ink or thread references. Decoration is a frequent source of sample rework because a logo that looks right on screen is often too large or too small on the body.

    8. Packing and Shipping Instructions

    How each unit is folded, bagged and labelled, what goes on the hang tag and the poly bag, the barcode or FNSKU placement, the carton size and the units per carton, and the carton marking. If the goods are going into Amazon FBA, the FNSKU label, the suffocation warning and the carton content limits are requirements rather than preferences, and the factory needs them in writing before production, not at the packing stage.

    9. Sample Request and Approval Record

    A short section stating which sample stage you are requesting, the quantity and sizes, the ship-to address, and a space to record comments and approvals per round. The proto sample tests the factory's reading of the tech pack; the fit sample tests the measurements on a body; the pre-production sample, made in production fabric, colours and labels, is the one whose approval commits both sides to the run. Recording each round against the tech pack version keeps the whole history in one document.

    How Complete Does It Need to Be at Each Stage?

    Not every stage needs the whole document, and asking for a fully finished tech pack before a first quote is one reason brands stall for months. A practical sequence for a first order is as follows.

  • For a first quote, a factory or a sourcing partner needs the style summary, a flat sketch or clear reference images, the fabric specification (at minimum fiber, construction, weight and finish), the decoration method, the number of styles and colourways, the quantity per style-colour, any certification requirement and the target delivery date. That is enough to return a comparable price, a minimum order quantity and a lead time. SourceBridge matches a brief at this level of detail to two or three factories and returns pricing, certifications, lead times and factory profiles within 24 hours.
  • For a proto sample, add the construction details, the base-size measurements, and the label and decoration placement. The factory will make the proto in available fabric if the production fabric is not yet sourced, and the goal of the round is to confirm shape and construction, not colour.
  • For the pre-production sample and the production order, the tech pack must be complete: full grading, all colourways, final artwork, confirmed materials with references, and packing instructions. The approved pre-production sample and this final version of the document are the standard the production run is inspected against.
  • The usual timeline in Turkey is 7 to 14 days per sample round in the factory plus 5 to 7 days by courier to the US, with two to three rounds before pre-production approval, followed by 4 to 8 weeks of production. A complete tech pack does not shorten the factory's time per round, but it very often removes a round.

    Tech Pack, Spec Sheet, Pattern: What Each One Is

    The three terms are used loosely, and clarity about them prevents a common misunderstanding with factories.

  • A spec sheet is the measurement page: points of measure, tolerances and grading. It is one section of a tech pack, not a substitute for it. A factory that receives only a spec sheet knows what size the garment should be but not how it is built or what it is made of.
  • A pattern is the set of shaped pieces, on paper or as a digital file, from which the fabric is cut. It is derived from the tech pack, usually by the factory's pattern maker for a first order, and it is graded to produce each size. Many overseas factories include pattern making in the sampling process; many domestic sample rooms expect you to supply it. Ask, because the answer changes what you need to prepare.
  • A tech pack is the full document: sketches, materials, construction, measurements, colourways, branding, packing and the sample record. It is the brief from which both the pattern and the quote are produced.
  • Who Makes the Tech Pack

    Four options exist, and they are not mutually exclusive.

  • You make it. If you or someone on your team can draw a flat and write a measurement table, a first tech pack for a simple garment is a few days of work. Free and paid templates exist, and tech pack software adds version control and a component library, which becomes valuable once you have more than a handful of styles.
  • A freelance technical designer makes it. This is the standard route for brands without in-house technical skill. The designer works from your sketches or references and produces the document, often including grading. Cost depends on garment complexity, the number of styles and colourways, and how many revisions are included, so ask for those to be stated before agreeing a price.
  • The factory develops it with you. Some factories will build a tech pack from your reference garment or images as part of sampling, particularly when they expect a production order. The trade-off is that the document then reflects the factory's construction conventions and its available materials, which is efficient for that factory but makes moving the style elsewhere harder later.
  • A sourcing partner develops it from your references. SourceBridge develops a tech pack from a brand's design references as part of its Turkey sourcing service, so that the brief that reaches the factory is complete before the first sample is cut. This is the right route for a brand that knows what it wants but does not yet have the technical document.
  • Whichever route you take, keep the tech pack in your own possession and in a format you can edit. It is a brand asset. A style that lives only in a factory's files is a style you cannot re-quote elsewhere.

    Common Mistakes in First Tech Packs

    The following come up repeatedly in tech packs from first-time buyers and are worth checking before the document is sent.

  • Fabric described by feel rather than specification. "Soft, heavyweight cotton" is not a fabric. "100% combed cotton, single jersey, 220 gsm, enzyme washed" is.
  • Measurements without tolerances. A factory needs to know how much variation is acceptable at each point of measure, stated in centimeters or fractions of an inch. A spec with no tolerance is either unenforceable or an argument waiting to happen.
  • Placement described in words only. "Logo on left chest" can be interpreted in a dozen ways. A diagram with a measurement from the high point shoulder and from the center front is one way.
  • Sizing system left implicit. State US, UK or EU sizing and provide the base-size measurements. Do not assume the factory's medium is your medium.
  • Packaging left for later. Poly bag, hang tag, FNSKU and carton details decided after production starts often mean repacking at the factory, or worse, at a US prep center.
  • No version number. When the fit sample comes back and the factory asks which measurement table it should have used, the answer needs to be a version, not a date range in an email thread.
  • Certifications mentioned once, not attached to a material. If the product must be OEKO-TEX certified, the fabric line in the bill of materials must say so, and the certificate should be requested against that fabric, not against the factory in general.
  • What to Send If You Do Not Have a Tech Pack Yet

    A missing tech pack should not stop a first enquiry, and it is better to send a clear partial brief than to wait. What a manufacturer or a sourcing partner can work from is a reference garment or reference images with the changes you want marked, a fabric description at the level of fiber, construction and weight, the number of styles, colours and units, your target retail price or target unit cost, any certification or packaging requirement, and your delivery date. The guide on how to find a clothing manufacturer includes an enquiry template built on exactly these items, and the guide on clothing manufacturers for startups covers how to structure a first order so that it clears a factory's minimum.

    From that brief, the tech pack gets built before the first sample rather than before the first conversation. Either you commission it, the factory develops it during sampling, or a partner develops it as part of the program. The step-by-step guide to launching a private label clothing brand from Turkey places this in the full sequence from product definition to shipped goods.

    Frequently Asked Questions

    What is the difference between a tech pack and a spec sheet?

    A spec sheet is the measurement section of a tech pack: the points of measure for the base size, the tolerances and the grade rules for other sizes. A tech pack contains the spec sheet plus everything else a factory needs, including flat sketches, the bill of materials, construction details, colourways, label and decoration placement, and packing instructions. Sending a spec sheet alone tells a factory what size to make, not how to make it or what from.

    What is the difference between a pattern and a tech pack?

    A pattern is the set of cut pieces, paper or digital, from which the fabric is cut, graded to each size. A tech pack is the document that describes the finished garment, from which the pattern is made. For a first order with an overseas factory, the factory's pattern maker usually produces the pattern from your tech pack during sampling; many domestic sample rooms expect you to bring a graded pattern with you. Ask which the factory expects before you send the brief.

    Who uses tech packs?

    Brands use them to brief manufacturers; factories use them to quote, to make patterns and samples, and to check production; technical designers write them; sourcing partners use them to get comparable quotes from several factories on the same basis; and quality inspectors use them, together with the approved pre-production sample, as the standard a finished order is measured against. Any brand ordering a custom garment, rather than decorating blanks, will need one at some stage.

    How much should a tech pack cost?

    There is no standard price. The cost of a tech pack made by a freelance technical designer depends on the complexity of the garment, the number of styles and colourways, whether grading is included, and how many revision rounds are covered, so any quote should state those four things. A simple T-shirt is a very different job from a lined jacket. Some factories and sourcing partners develop the tech pack as part of the sampling process instead of charging for it separately; SourceBridge does this from a brand's design references as part of its Turkey sourcing service.

    Do I need a tech pack to get a quote from a manufacturer?

    Not a complete one. For a first quote a factory needs the style, a sketch or reference images, the fabric specification, the decoration method, the number of styles and colours, the quantity per style-colour, any certification requirement and the delivery date. That is enough for a price, a minimum order quantity and a lead time. The full tech pack is needed before the pre-production sample and the production order, when every detail becomes binding.

    Can a manufacturer make a tech pack for me?

    Some can, particularly when they expect a production order, and they will build it from your reference garment or images during sampling. The document will then follow that factory's construction habits and available materials. That is efficient for that order but makes the style harder to move to another factory later, so ask for an editable copy and keep it. A sourcing partner can also develop the tech pack from your references so that the brief is complete before the first sample is cut.

    What file format should a tech pack be in?

    Any format the factory can open and you can edit: a PDF exported from a spreadsheet, a slide deck or a design tool is the most common, and tech pack software exports to PDF as well. Send artwork for prints, embroidery and labels as separate vector files in addition to the tech pack. Whatever the format, put the style number and the version number on every page, and keep the editable source file yourself.

    tech packwhat is a tech packtech pack for clothinghow to make a tech packclothing manufacturer brief
    Alex Morgan

    Written by Alex Morgan

    Senior Sourcing Specialist Β· SourceBridge

    Alex has 10+ years of experience connecting American brands with top manufacturers in Turkey, China, and the USA. He specializes in private label product sourcing, Amazon FBA strategy, and helping entrepreneurs launch profitable brands with the right factory partners.

    Back to Blog

    Ready to Source This Product?

    Chat with Alex and get a free sourcing quote within 24 hours.

    πŸ‘‹ Hi! I'm Alex

    Need help sourcing a product? Let's chat!